TEXAS · TCEQ REGION 14 · 15 COUNTIES

Aerobic septic systems in TCEQ Region 14 (Corpus Christi)

TCEQ Region 14 office (Corpus Christi)

500 North Shoreline Blvd, Ste 500, Corpus Christi TX 78401-0318
Main line: 361-881-6900

TCEQ does not permit septic systems in any of these 15 counties. For an OSSF permit or a maintenance report, use the county's authorized agent in the table below.

From TCEQ's regional office directory, read Oct 31, 2026.

TCEQ Region 14 (Corpus Christi) covers 15 Texas counties: Aransas, Bee, Calhoun, DeWitt, Goliad, Gonzales, Jackson, Jim Wells, Kleberg, Lavaca, Live Oak, Nueces, Refugio, San Patricio and Victoria.

All 15 counties permit on-site sewage facilities through a local authorized agent (a county), and maintenance reports go to that agent.

Reports are due within 14 days after the test (30 TAC §285.7(e)(1)(B)). No county in this region has published how maintenance providers submit the report, so every county page here says so rather than guessing.

8,683 aerobic systems were authorized across the region from 2015 to 2025. In 2025, 762 of the region’s 1,574 on-site sewage facility authorizations were aerobic (48.4%).

COUNTIES
15
LOCAL AUTHORIZED AGENTS
15
AEROBIC PERMITS 2015–25
8,683
AEROBIC SHARE, 2025
48.4%

Counties in TCEQ Region 14 (Corpus Christi)

Counties in TCEQ Region 14 (Corpus Christi), with permitting authority, filing channel and permits
COUNTY PERMITTING AUTHORITY HOW TO FILE AEROBIC 2015–25 AEROBIC 2025 MPs
Aransas Aransas County Not confirmed 782 53 14
Bee Bee County Not confirmed 94 13 2
Calhoun Calhoun County Not confirmed 880 63 0
DeWitt Dewitt County Not confirmed 274 23 3
Goliad Goliad County Not confirmed 0 0 4
Gonzales Gonzales County Not confirmed 697 74 3
Jackson Jackson County Not confirmed 749 64 3
Jim Wells Jim Wells County Not confirmed 48 9 3
Kleberg Kleberg County Not confirmed 8 3 2
Lavaca Lavaca County Not confirmed 1,050 113 6
Live Oak Live Oak County Not confirmed 28 4 0
Nueces Nueces County Not confirmed 1,686 149 4
Refugio Refugio County Not confirmed 197 23 0
San Patricio San Patricio County Not confirmed 407 40 3
Victoria Victoria County Not confirmed 1,783 131 11

MPs are licensed OSSF maintenance providers whose license mailing address is in the county. Each provider is counted once, where it is based; many also work in neighboring counties.

Permits across the region, 2015–2025

YEAR ALL OSSF SURFACE (SPRAY) DRIP
2015 1,446 727 27
2016 1,478 670 22
2017 1,330 636 25
2018 1,440 613 52
2019 1,653 820 68
2020 1,730 835 75
2021 1,776 867 71
2022 1,782 871 89
2023 1,476 646 92
2024 1,449 650 65
2025 1,574 675 87

Authorizations to Construct from the eleven annual TCEQ “Types of Systems Installed” reports, summed over the region’s counties. Surface irrigation and drip both require aerobic pretreatment. The statewide dataset has the CSV, and the 2025 report compares the regions.

The rules are the same in every county

  • · An aerobic system with surface application is tested every four months (30 TAC §285.91(4), Table IV). How often systems are inspected.
  • · Each report goes to the permitting authority and the owner within 14 days of the test (30 TAC §285.7(e)(1)(B)). The deadline rule.
  • · A new aerobic system starts with a two-year service policy (30 TAC §285.7(c)). After that the owner renews the maintenance contract or, for a single-family home, may maintain the system themselves where local rules allow (§285.7(d)(4)). What the contract must say.

Common questions

Which counties are in TCEQ Region 14 (Corpus Christi)?

15 Texas counties: Aransas, Bee, Calhoun, DeWitt, Goliad, Gonzales, Jackson, Jim Wells, Kleberg, Lavaca, Live Oak, Nueces, Refugio, San Patricio and Victoria.

Who permits aerobic septic systems in TCEQ Region 14 (Corpus Christi)?

All 15 counties permit on-site sewage facilities through a local authorized agent (a county), and maintenance reports go to that agent.

How many aerobic septic systems were permitted in the Corpus Christi region?

8,683 aerobic systems were authorized across the region from 2015 to 2025. In 2025, 762 of the region’s 1,574 on-site sewage facility authorizations were aerobic (48.4%).

When is an aerobic maintenance report due in TCEQ Region 14 (Corpus Christi)?

Within 14 days after the date the test is performed, everywhere in Texas. 30 TAC §285.7(e)(1)(B) requires the report to go to the permitting authority and to the system owner.

Data as of Oct 5, 2026, from the TCEQ authorized-agent register, the OSSF license register, the annual “Types of Systems Installed” reports and the counties’ own pages. How we research and check this. Not legal advice. Verify with your permitting authority.