TEXAS · TCEQ REGION 09 · 20 COUNTIES

Aerobic septic systems in TCEQ Region 09 (Waco)

TCEQ Region 09 office (Waco)

6801 Sanger Ave, Ste 2500, Waco TX 76710-7826
Main line: 254-751-0335

TCEQ does not permit septic systems in any of these 20 counties. For an OSSF permit or a maintenance report, use the county's authorized agent in the table below.

From TCEQ's regional office directory, read Oct 31, 2026.

TCEQ Region 09 (Waco) covers 20 Texas counties: Bell, Bosque, Brazos, Burleson, Coryell, Falls, Freestone, Grimes, Hamilton, Hill, Lampasas, Leon, Limestone, Madison, McLennan, Milam, Mills, Robertson, San Saba and Washington.

All 20 counties permit on-site sewage facilities through a local authorized agent (a health district or a county), and maintenance reports go to that agent.

Reports are due within 14 days after the test (30 TAC §285.7(e)(1)(B)). No county in this region has published how maintenance providers submit the report, so every county page here says so rather than guessing.

25,048 aerobic systems were authorized across the region from 2015 to 2025. In 2025, 2,988 of the region’s 4,017 on-site sewage facility authorizations were aerobic (74.4%).

COUNTIES
20
LOCAL AUTHORIZED AGENTS
20
AEROBIC PERMITS 2015–25
25,048
AEROBIC SHARE, 2025
74.4%

Counties in TCEQ Region 09 (Waco)

Counties in TCEQ Region 09 (Waco), with permitting authority, filing channel and permits
COUNTY PERMITTING AUTHORITY HOW TO FILE AEROBIC 2015–25 AEROBIC 2025 MPs
Bell Bell County Public Health District Not confirmed 5,293 613 21
Bosque Bosque County Not confirmed 506 58 2
Brazos Brazos County Not confirmed 3,027 284 23
Burleson Burleson County Not confirmed 1,488 177 6
Coryell Coryell County Not confirmed 572 49 11
Falls Falls County Not confirmed 534 78 1
Freestone Freestone County Not confirmed 540 75 1
Grimes Grimes County Not confirmed 2,549 326 12
Hamilton Hamilton County Not confirmed 139 20 1
Hill Hill County Not confirmed 1,960 246 11
Lampasas Lampasas County Not confirmed 587 59 7
Leon Leon County Not confirmed 763 112 8
Limestone Limestone County Not confirmed 950 118 3
Madison Madison County Not confirmed 732 78 2
McLennan Mclennan County Not confirmed 3,899 410 23
Milam Milam County Not confirmed 622 96 4
Mills Mills County Not confirmed 37 6 0
Robertson Robertson County Not confirmed 635 101 1
San Saba San Saba County Not confirmed 16 14 2
Washington Washington County Not confirmed 199 68 7

MPs are licensed OSSF maintenance providers whose license mailing address is in the county. Each provider is counted once, where it is based; many also work in neighboring counties.

Permits across the region, 2015–2025

YEAR ALL OSSF SURFACE (SPRAY) DRIP
2015 2,022 1,148 28
2016 2,340 1,326 29
2017 2,816 1,627 33
2018 2,910 1,754 45
2019 3,091 1,891 76
2020 3,751 2,291 140
2021 4,016 2,534 112
2022 4,819 3,337 117
2023 4,212 2,775 138
2024 3,790 2,482 177
2025 4,017 2,793 195

Authorizations to Construct from the eleven annual TCEQ “Types of Systems Installed” reports, summed over the region’s counties. Surface irrigation and drip both require aerobic pretreatment. The statewide dataset has the CSV, and the 2025 report compares the regions.

The rules are the same in every county

  • · An aerobic system with surface application is tested every four months (30 TAC §285.91(4), Table IV). How often systems are inspected.
  • · Each report goes to the permitting authority and the owner within 14 days of the test (30 TAC §285.7(e)(1)(B)). The deadline rule.
  • · A new aerobic system starts with a two-year service policy (30 TAC §285.7(c)). After that the owner renews the maintenance contract or, for a single-family home, may maintain the system themselves where local rules allow (§285.7(d)(4)). What the contract must say.

Common questions

Which counties are in TCEQ Region 09 (Waco)?

20 Texas counties: Bell, Bosque, Brazos, Burleson, Coryell, Falls, Freestone, Grimes, Hamilton, Hill, Lampasas, Leon, Limestone, Madison, McLennan, Milam, Mills, Robertson, San Saba and Washington.

Who permits aerobic septic systems in TCEQ Region 09 (Waco)?

All 20 counties permit on-site sewage facilities through a local authorized agent (a health district or a county), and maintenance reports go to that agent.

How many aerobic septic systems were permitted in the Waco region?

25,048 aerobic systems were authorized across the region from 2015 to 2025. In 2025, 2,988 of the region’s 4,017 on-site sewage facility authorizations were aerobic (74.4%).

When is an aerobic maintenance report due in TCEQ Region 09 (Waco)?

Within 14 days after the date the test is performed, everywhere in Texas. 30 TAC §285.7(e)(1)(B) requires the report to go to the permitting authority and to the system owner.

Data as of Oct 5, 2026, from the TCEQ authorized-agent register, the OSSF license register, the annual “Types of Systems Installed” reports and the counties’ own pages. How we research and check this. Not legal advice. Verify with your permitting authority.