Contracts, visits & deadlines
Keep maintenance records, inspection dates, report deadlines, and renewal work together.
ABOUT
DulyTrack is compliance and operations software for companies that maintain aerobic septic systems in Texas and North Carolina. It keeps the schedule the state rules set: the next test on every system, the report due after each visit, where each county takes that report, and the contracts coming up for renewal. It is in early access with founding partners, and it is operated by Dulytrack Inc.
OTHER RECURRING SERVICE WORK
Start free in any specialist workspace, then confirm your trade, records, locality and reporting path before relying on a workflow. A setup review with us is available for each one.
Free, Solo and Team describe the supported core septic workflow and use active-contract and staff counts. For specialist work, confirm access, asset, site or facility allowances, and setup with us before choosing a package. No separate specialist price is published.
WHAT YOU CAN EXPECT
Early access includes Free forever and optional Solo or Team trials. County dispatch, specialist workspaces, imports and integrations need their own setup review.
Keep maintenance records, inspection dates, report deadlines, and renewal work together.
Prepare the report and retain delivery evidence. Automatic dispatch requires an enabled, tested county connector; a researched filing channel does not establish automation.
Review your spreadsheet or CSV before importing. SAFE-specific compatibility requires validation against a real export.
Online homeowner payments and autopay are planned. They are not included as available features in the trial.
Free forever for up to 5 active contracts and 1 staff user; optional 30-day Solo or Team trial, no card needed. Availability descriptions do not establish that a live county or third-party connection is enabled.
In Texas an aerobic system under a maintenance contract is tested at least every four months (30 TAC §285.91(4), Table IV), and each report goes to the permitting authority and the owner within 14 days of the test (30 TAC §285.7(e)(1)(B)). There are 254 counties, and they do not all take the report the same way. In North Carolina a certified operator inspects on the schedule Table XXXII sets for the system type and reports to the owner, the local health department and the manufacturer within 30 days. A provider with a few hundred contracts is tracking more than a thousand dates a year, and each missed one is a late report with its name on it.
DulyTrack is built around those dates: the visit schedule, the filing deadline, the county’s channel, and the renewal and lapse notices the rules require, for Texas providers and North Carolina operators. The product tour shows how it works and pricing sets out what it costs.
The reference pages are free to read and to quote with attribution. Each one carries its citation and the date it was last checked.
Every rule summary is written against the rule text and dated. County facts come from the TCEQ registers and each county’s own pages, and a filing channel is never stated unless a source shows it. When we get something wrong we correct it and log the correction with its date. The methodology page sets this out in full. Nothing on this site is legal advice: verify with your permitting authority or local health department.
Email hello@dulytrack.com. To review your records, capacity, or an existing agreement, ask about your setup.