ABOUT

About DulyTrack

DulyTrack is compliance and operations software for companies that maintain aerobic septic systems in Texas and North Carolina. It keeps the schedule the state rules set: the next test on every system, the report due after each visit, where each county takes that report, and the contracts coming up for renewal. It is in early access with founding partners, and it is operated by Dulytrack Inc.

OTHER RECURRING SERVICE WORK

Records for your specialist workflow.

Start free in any specialist workspace, then confirm your trade, records, locality and reporting path before relying on a workflow. A setup review with us is available for each one.

Free, Solo and Team describe the supported core septic workflow and use active-contract and staff counts. For specialist work, confirm access, asset, site or facility allowances, and setup with us before choosing a package. No separate specialist price is published.

WHAT YOU CAN EXPECT

Start with a clear scope.

Early access includes Free forever and optional Solo or Team trials. County dispatch, specialist workspaces, imports and integrations need their own setup review.

Core workflow

Contracts, visits & deadlines

Keep maintenance records, inspection dates, report deadlines, and renewal work together.

County dependent

County report preparation

Prepare the report and retain delivery evidence. Automatic dispatch requires an enabled, tested county connector; a researched filing channel does not establish automation.

Mapping review

Bringing existing records

Review your spreadsheet or CSV before importing. SAFE-specific compatibility requires validation against a real export.

Planned

Homeowner payments & autopay

Online homeowner payments and autopay are planned. They are not included as available features in the trial.

Free forever for up to 5 active contracts and 1 staff user; optional 30-day Solo or Team trial, no card needed. Availability descriptions do not establish that a live county or third-party connection is enabled.

DulyTrack in brief

Name
DulyTrack
Operated by
Dulytrack Inc.
What it is
Compliance and operations software for onsite-wastewater (aerobic septic) maintenance providers
Who it is for
Texas maintenance providers under 30 TAC Chapter 285, and North Carolina certified operators under 15A NCAC 18E
Status
Early access with Free forever and optional 30-day Solo or Team trials
Monthly packages
Free $0 forever for up to 5 active contracts and 1 named staff user; Solo $19/month for up to 100 active contracts and 1 named staff user; Team $49/month for up to 500 active contracts and 5 named staff users. Above 500 contracts or 5 staff: capacity review before switching. Existing terms are preserved; plan changes are explicit.
Existing founding agreements
12 months at $0, then $50 + 50¢ per contract, locked for three years
States
Texas and North Carolina workflows; availability depends on system and county setup. Virginia is planned.
Affiliation
None. Not affiliated with TCEQ, NC DHHS, any county or local health department, or any system manufacturer
Website
dulytrack.com
Contact
hello@dulytrack.com

The problem it is for

In Texas an aerobic system under a maintenance contract is tested at least every four months (30 TAC §285.91(4), Table IV), and each report goes to the permitting authority and the owner within 14 days of the test (30 TAC §285.7(e)(1)(B)). There are 254 counties, and they do not all take the report the same way. In North Carolina a certified operator inspects on the schedule Table XXXII sets for the system type and reports to the owner, the local health department and the manufacturer within 30 days. A provider with a few hundred contracts is tracking more than a thousand dates a year, and each missed one is a late report with its name on it.

DulyTrack is built around those dates: the visit schedule, the filing deadline, the county’s channel, and the renewal and lapse notices the rules require, for Texas providers and North Carolina operators. The product tour shows how it works and pricing sets out what it costs.

What is free on this site

The reference pages are free to read and to quote with attribution. Each one carries its citation and the date it was last checked.

  • 25 rule pages: 14 on Texas 30 TAC Chapter 285, 11 on North Carolina 15A NCAC 18E.
  • All 254 Texas counties: who permits systems, how the report is filed where that is published, and eleven years of permit history, grouped into the sixteen TCEQ regions.
  • An open dataset of Texas aerobic permits by county, 2015–2025, and the 2025 report computed from it.
  • 13 free tools, including the deadline calculator and a contract tracking spreadsheet.
  • A glossary of the terms, each with its rule citation.

How the content is checked

Every rule summary is written against the rule text and dated. County facts come from the TCEQ registers and each county’s own pages, and a filing channel is never stated unless a source shows it. When we get something wrong we correct it and log the correction with its date. The methodology page sets this out in full. Nothing on this site is legal advice: verify with your permitting authority or local health department.

Contact

Email hello@dulytrack.com. To review your records, capacity, or an existing agreement, ask about your setup.