TEXAS · TCEQ REGION 01 · 26 COUNTIES

Aerobic septic systems in TCEQ Region 01 (Amarillo)

TCEQ Region 01 office (Amarillo)

5809 S. Western St. STE 260, Amarillo TX 79110-3631
Main line: 806-353-9251

This office permits septic systems and takes maintenance reports for the 20 counties without a local authorized agent; the other 6 permit locally.

From TCEQ's regional office directory, read Oct 31, 2026.

TCEQ Region 01 (Amarillo) covers 26 Texas counties: Armstrong, Briscoe, Carson, Castro, Childress, Collingsworth, Dallam, Deaf Smith, Donley, Gray, Hall, Hansford, Hartley, Hemphill, Hutchinson, Lipscomb, Moore, Ochiltree, Oldham, Parmer, Potter, Randall, Roberts, Sherman, Swisher and Wheeler.

6 of the 26 counties permit on-site sewage facilities through a local authorized agent (a county). The other 20 have none, so the TCEQ Region 01 (Amarillo) office (806-353-9251) permits systems and takes maintenance reports there.

Reports are due within 14 days after the test (30 TAC §285.7(e)(1)(B)). No county in this region has published how maintenance providers submit the report, so every county page here says so rather than guessing.

48 aerobic systems were authorized across the region from 2015 to 2025. In 2025, 2 of the region’s 613 on-site sewage facility authorizations were aerobic (0.3%).

COUNTIES
26
LOCAL AUTHORIZED AGENTS
6
AEROBIC PERMITS 2015–25
48
AEROBIC SHARE, 2025
0.3%

Counties in TCEQ Region 01 (Amarillo)

Counties in TCEQ Region 01 (Amarillo), with permitting authority, filing channel and permits
COUNTY PERMITTING AUTHORITY HOW TO FILE AEROBIC 2015–25 AEROBIC 2025 MPs
Armstrong TCEQ Region 01 - Amarillo Not confirmed 0 0 0
Briscoe TCEQ Region 01 - Amarillo Not confirmed 0 0 0
Carson TCEQ Region 01 - Amarillo Not confirmed 0 0 0
Castro TCEQ Region 01 - Amarillo Not confirmed 0 0 0
Childress TCEQ Region 01 - Amarillo Not confirmed 0 0 0
Collingsworth TCEQ Region 01 - Amarillo Not confirmed 0 0 0
Dallam Dallam County Not confirmed 0 0 0
Deaf Smith Deaf Smith County Not confirmed 0 0 0
Donley TCEQ Region 01 - Amarillo Not confirmed 0 0 0
Gray TCEQ Region 01 - Amarillo Not confirmed 0 0 0
Hall TCEQ Region 01 - Amarillo Not confirmed 0 0 0
Hansford TCEQ Region 01 - Amarillo Not confirmed 0 0 0
Hartley Hartley County Not confirmed 0 0 0
Hemphill TCEQ Region 01 - Amarillo Not confirmed 0 0 0
Hutchinson Hutchinson County Not confirmed 1 0 0
Lipscomb TCEQ Region 01 - Amarillo Not confirmed 0 0 0
Moore TCEQ Region 01 - Amarillo Not confirmed 0 0 0
Ochiltree TCEQ Region 01 - Amarillo Not confirmed 0 0 1
Oldham TCEQ Region 01 - Amarillo Not confirmed 0 0 0
Parmer TCEQ Region 01 - Amarillo Not confirmed 0 0 0
Potter Potter County Not confirmed 8 0 0
Randall Randall County Not confirmed 39 2 3
Roberts TCEQ Region 01 - Amarillo Not confirmed 0 0 0
Sherman TCEQ Region 01 - Amarillo Not confirmed 0 0 0
Swisher TCEQ Region 01 - Amarillo Not confirmed 0 0 0
Wheeler TCEQ Region 01 - Amarillo Not confirmed 0 0 0

MPs are licensed OSSF maintenance providers whose license mailing address is in the county. Each provider is counted once, where it is based; many also work in neighboring counties.

Permits across the region, 2015–2025

YEAR ALL OSSF SURFACE (SPRAY) DRIP
2015 493 5 2
2016 520 1 1
2017 516 2 7
2018 563 0 2
2019 661 0 1
2020 737 3 7
2021 873 2 7
2022 929 0 1
2023 683 3 0
2024 587 0 2
2025 613 0 2

Authorizations to Construct from the eleven annual TCEQ “Types of Systems Installed” reports, summed over the region’s counties. Surface irrigation and drip both require aerobic pretreatment. The statewide dataset has the CSV, and the 2025 report compares the regions.

The rules are the same in every county

  • · An aerobic system with surface application is tested every four months (30 TAC §285.91(4), Table IV). How often systems are inspected.
  • · Each report goes to the permitting authority and the owner within 14 days of the test (30 TAC §285.7(e)(1)(B)). The deadline rule.
  • · A new aerobic system starts with a two-year service policy (30 TAC §285.7(c)). After that the owner renews the maintenance contract or, for a single-family home, may maintain the system themselves where local rules allow (§285.7(d)(4)). What the contract must say.

Common questions

Which counties are in TCEQ Region 01 (Amarillo)?

26 Texas counties: Armstrong, Briscoe, Carson, Castro, Childress, Collingsworth, Dallam, Deaf Smith, Donley, Gray, Hall, Hansford, Hartley, Hemphill, Hutchinson, Lipscomb, Moore, Ochiltree, Oldham, Parmer, Potter, Randall, Roberts, Sherman, Swisher and Wheeler.

Who permits aerobic septic systems in TCEQ Region 01 (Amarillo)?

6 of the 26 counties permit on-site sewage facilities through a local authorized agent (a county). The other 20 have none, so the TCEQ Region 01 (Amarillo) office (806-353-9251) permits systems and takes maintenance reports there.

How many aerobic septic systems were permitted in the Amarillo region?

48 aerobic systems were authorized across the region from 2015 to 2025. In 2025, 2 of the region’s 613 on-site sewage facility authorizations were aerobic (0.3%).

When is an aerobic maintenance report due in TCEQ Region 01 (Amarillo)?

Within 14 days after the date the test is performed, everywhere in Texas. 30 TAC §285.7(e)(1)(B) requires the report to go to the permitting authority and to the system owner.

Data as of Oct 5, 2026, from the TCEQ authorized-agent register, the OSSF license register, the annual “Types of Systems Installed” reports and the counties’ own pages. How we research and check this. Not legal advice. Verify with your permitting authority.