TEXAS · TCEQ REGION 11 · 10 COUNTIES

Aerobic septic systems in TCEQ Region 11 (Austin)

TCEQ Region 11 office (Austin)

12100 Park 35 Circle, Bldg A, Rm 179, Austin TX 78753
Main line: 512-339-2929

TCEQ does not permit septic systems in any of these 10 counties. For an OSSF permit or a maintenance report, use the county's authorized agent in the table below.

From TCEQ's regional office directory, read Oct 31, 2026.

TCEQ Region 11 (Austin) covers 10 Texas counties: Bastrop, Blanco, Burnet, Caldwell, Fayette, Hays, Lee, Llano, Travis and Williamson.

All 10 counties permit on-site sewage facilities through a local authorized agent (a county), and maintenance reports go to that agent.

Reports are due within 14 days after the test (30 TAC §285.7(e)(1)(B)). No county in this region has published how maintenance providers submit the report, so every county page here says so rather than guessing.

28,477 aerobic systems were authorized across the region from 2015 to 2025. In 2025, 1,988 of the region’s 3,115 on-site sewage facility authorizations were aerobic (63.8%).

COUNTIES
10
LOCAL AUTHORIZED AGENTS
10
AEROBIC PERMITS 2015–25
28,477
AEROBIC SHARE, 2025
63.8%

Counties in TCEQ Region 11 (Austin)

Counties in TCEQ Region 11 (Austin), with permitting authority, filing channel and permits
COUNTY PERMITTING AUTHORITY HOW TO FILE AEROBIC 2015–25 AEROBIC 2025 MPs
Bastrop Bastrop County Not confirmed 7,337 597 25
Blanco Blanco County Not confirmed 790 61 4
Burnet Burnet County Not confirmed 1,935 220 4
Caldwell Caldwell County Not confirmed 1,963 41 12
Fayette Fayette County Not confirmed 1,296 129 9
Hays Hays County Not confirmed 5,183 143 32
Lee Lee County Not confirmed 907 79 4
Llano Llano County Not confirmed 352 51 5
Travis Travis County Not confirmed 5,065 287 22
Williamson Williamson County Not confirmed 3,649 380 23

MPs are licensed OSSF maintenance providers whose license mailing address is in the county. Each provider is counted once, where it is based; many also work in neighboring counties.

Permits across the region, 2015–2025

YEAR ALL OSSF SURFACE (SPRAY) DRIP
2015 3,443 1,175 518
2016 3,762 1,399 552
2017 4,129 1,493 594
2018 4,428 1,651 669
2019 4,766 1,901 649
2020 5,636 2,205 805
2021 6,266 2,760 1,093
2022 5,782 2,602 1,041
2023 4,813 1,843 886
2024 4,144 1,760 893
2025 3,115 1,300 688

Authorizations to Construct from the eleven annual TCEQ “Types of Systems Installed” reports, summed over the region’s counties. Surface irrigation and drip both require aerobic pretreatment. The statewide dataset has the CSV, and the 2025 report compares the regions.

The rules are the same in every county

  • · An aerobic system with surface application is tested every four months (30 TAC §285.91(4), Table IV). How often systems are inspected.
  • · Each report goes to the permitting authority and the owner within 14 days of the test (30 TAC §285.7(e)(1)(B)). The deadline rule.
  • · A new aerobic system starts with a two-year service policy (30 TAC §285.7(c)). After that the owner renews the maintenance contract or, for a single-family home, may maintain the system themselves where local rules allow (§285.7(d)(4)). What the contract must say.

Common questions

Which counties are in TCEQ Region 11 (Austin)?

10 Texas counties: Bastrop, Blanco, Burnet, Caldwell, Fayette, Hays, Lee, Llano, Travis and Williamson.

Who permits aerobic septic systems in TCEQ Region 11 (Austin)?

All 10 counties permit on-site sewage facilities through a local authorized agent (a county), and maintenance reports go to that agent.

How many aerobic septic systems were permitted in the Austin region?

28,477 aerobic systems were authorized across the region from 2015 to 2025. In 2025, 1,988 of the region’s 3,115 on-site sewage facility authorizations were aerobic (63.8%).

When is an aerobic maintenance report due in TCEQ Region 11 (Austin)?

Within 14 days after the date the test is performed, everywhere in Texas. 30 TAC §285.7(e)(1)(B) requires the report to go to the permitting authority and to the system owner.

Data as of Oct 5, 2026, from the TCEQ authorized-agent register, the OSSF license register, the annual “Types of Systems Installed” reports and the counties’ own pages. How we research and check this. Not legal advice. Verify with your permitting authority.