RULES · PLAIN ENGLISH · WITH CITATIONS

The rules, written out, with the citation beside every claim.

One page per question a maintenance provider actually asks, for Texas under 30 TAC Chapter 285 and North Carolina under 15A NCAC 18E. Each carries the rule it comes from, the date it was last checked, and links to the regulation itself so you can read the original rather than trust us. Not legal advice.

Texas · 30 TAC Chapter 285

Texas at a glance

Topic What the rule says Citation Explained on
Testing At least once every four months; two a year with qualifying electronic monitoring (§285.7(e)(3)) 30 TAC §285.91(4), Table IV Testing rules
Report deadline To the permitting authority and the owner within 14 days of the test 30 TAC §285.7(e)(1)(B) Report deadline rules
Who signs the report The licensed maintenance provider 30 TAC §285.7(b)(3) Who signs the report rules
New systems An initial two-year service policy from the date the system is first used 30 TAC §285.7(c) New systems rules
Contract contents Six required provisions, including items covered and the responsible provider 30 TAC §285.7(d)(1) Contract contents rules
Renewal The owner gets the signed contract to the permitting authority at least 30 days before the old one expires 30 TAC §285.7(d)(2) Renewal rules
Ending service Written notice at least 30 days before service stops, to the permitting authority and the manufacturer, and to the owner when the provider ends it 30 TAC §285.7(d)(3) Ending service rules
Owner self-maintenance Single-family owners only, and only after the initial two-year policy 30 TAC §285.7(d)(4) Owner self-maintenance rules
Home sale After the two-year policy, the buyer gets a contract within 30 days of the transfer or maintains a single-family system personally 30 TAC §285.3(b)(3) Home sale rules
Emergency repairs Written notice to the permitting authority within 72 hours after starting work 30 TAC §285.35(c) Emergency repairs rules
Pumping On a regular basis, by a TCEQ-registered transporter; no set interval 30 TAC §285.39(b) Pumping rules
Missed reports A stated ground to suspend or revoke the provider’s license 30 TAC §285.65 Missed reports rules

Summarizes public rules as of the dates on each page; not legal advice; verify with your permitting authority. Every page on the topic:

Buying or Selling a Home with an Aerobic System in Texas When a Texas home with an aerobic system sells, the permit moves to the buyer, who has 30 days to sign a maintenance contract after the two-year policy. Last verified Oct 14, 2026 Can Homeowners Maintain Their Own Aerobic System in Texas? Texas single-family owners may self-maintain an aerobic system after the two-year policy (30 TAC §285.7(d)(4)), subject to local rules. Provider steps. Last verified Oct 5, 2026 Emergency Repairs on a Texas OSSF: The 72-Hour Notice Texas lets an emergency repair start before any permit, then requires written notice to the permitting authority within 72 hours (30 TAC §285.35). Last verified Oct 14, 2026 How Often Must a Texas Aerobic System Be Pumped? Texas sets no pumping interval: 30 TAC §285.39(b) says pump on a regular basis to stop sludge spilling over, using a TCEQ-registered transporter. Last verified Oct 14, 2026 How Often Must an Aerobic System Be Inspected in Texas? Texas aerobic systems must be tested at least once every four months (30 TAC §285.91(4), Table IV); two per year with qualifying electronic monitoring. Last verified Oct 5, 2026 How to Become an Aerobic Maintenance Provider in Texas The TCEQ path to a Texas OSSF maintenance provider license: one of three prerequisites, two courses, an exam, a $111 fee, renewal every three years. Last verified Oct 14, 2026 Maintenance Provider vs Technician in Texas: Who Does What Texas maintenance provider license vs technician registration: who performs, who signs, supervision rules (30 TAC §285.64), three-year renewal and CE. Last verified Oct 5, 2026 New Aerobic System in Texas: The First Two Years The initial two-year service policy for a new Texas aerobic system (30 TAC §285.7(c)): start date, who files it, first four-month visit, provider duties. Last verified Oct 5, 2026 Texas Aerobic Maintenance Contract Requirements The six provisions a Texas aerobic maintenance contract must contain under 30 TAC §285.7(d), plus 30-day submittal and notice rules and the deed affidavit. Last verified Oct 5, 2026 Texas Aerobic System Chlorine and Disinfection Requirements Texas spray aerobic systems must disinfect effluent (30 TAC §285.33(d)(2)(D)) and meet 0.1 mg/l chlorine residual or 200 MPN fecal coliform (Table IV). Last verified Oct 5, 2026 What Happens If an Aerobic Report Is Late in Texas? Late or missed Texas aerobic reports: what 30 TAC §285.65 and §285.71 say about suspension, revocation and enforcement, and documenting a resubmission. Last verified Oct 5, 2026 What Must a Texas Aerobic Maintenance Report Include? What a Texas aerobic maintenance report must include: Figure 3 inspection items, Table IV test results, complaint responses, and the provider's signature. Last verified Oct 5, 2026 When Is the Texas Aerobic Maintenance Report Due? Texas aerobic maintenance reports are due within 14 days after the test, to the permitting authority and the owner (30 TAC §285.7(e)). Deadlines explained. Last verified Oct 5, 2026 Where Do Texas Providers File Aerobic Maintenance Reports? Texas aerobic reports go to the permitting authority (county, city, river authority or TCEQ region) and the owner within 14 days. Filing channels vary. Last verified Oct 5, 2026

North Carolina · 15A NCAC 18E

North Carolina at a glance

Topic What the rule says Citation Explained on
Who operates A Management Entity under contract for as long as the system is in use, for every Type IV, V and VI system 15A NCAC 18E .1303 Who operates rules
Operator certification The Management Entity is or employs a certified subsurface operator 15A NCAC 18E .1304(a) Operator certification rules
Inspection frequency LPP (Type IVa) twice a year from the start. Advanced pretreatment Type Va and Vc, and anaerobic drip Type Vd, at or under 1,500 gpd: quarterly in the first year, then twice a year once the system complies with its Operation Permit; over 1,500 and up to 3,000 gpd, four times a year 15A NCAC 18E .1301, Table XXXII Inspection frequency rules
Report deadline To the owner, the local health department and the manufacturer within 30 days of the inspection 15A NCAC 18E .1304(c) Report deadline rules
Repairs needed Notify the local health department within 48 hours 15A NCAC 18E .1304(d) Repairs needed rules
Non-renewal Notify the local health department and, as applicable, the manufacturer 15A NCAC 18E .1304(f) Non-renewal rules
Sampling An NSF/ANSI 40 RWTS is sampled annually; other approvals by their own schedule 15A NCAC 18E .1504, .1709 Sampling rules
Pumping When scum and sludge exceed one-third of the liquid depth in any compartment 15A NCAC 18E .1303(a)(3) Pumping rules
Operation Permit Issued by the local health department before the system is used; sets the conditions the operator works to 15A NCAC 18E .0205 Operation Permit rules

Summarizes public rules as of the dates on each page; not legal advice; verify with your permitting authority. Every page on the topic:

Does an NC Aerobic System Need a Maintenance Contract? Yes. NC Type IV, V, and VI systems need an O&M contract with a Management Entity before the OP, kept as long as the system is in use (18E .1303). Last verified Oct 8, 2026 How Often Are NC Septic Systems Inspected? (Table XXXII) NC Table XXXII sets inspection frequency by system type: LPP 2/year, most residential Type V 2/year after a quarterly first year (15A NCAC 18E .1301). Last verified Oct 8, 2026 How Often Must NC Aerobic Systems Be Sampled? NC advanced pretreatment sampling under 15A NCAC 18E .1504, .1709, and .1302: what is sampled, how often, who reports, and the 30-day resample rule. Last verified Oct 8, 2026 LPP vs Advanced Pretreatment: NC Operator Rules Compared NC rules for LPP (Type IVa) vs advanced pretreatment (Type V/VI): Table XXXII inspections, certified operators, sampling, and manufacturer roles. Last verified Oct 8, 2026 What Changed in NC Septic Rules in 2024 and 2026? 15A NCAC 18E replaced 18A .1900 on Jan 1, 2024 and was amended June 1, 2026. What changed for operators, plus an old-to-new citation map. Last verified Oct 8, 2026 What Conditions Does an NC Septic Operation Permit Set? The NC Operation Permit (15A NCAC 18E .0205): when it is issued, 5-year expiration for Type V and VI, conditions that bind the Management Entity, reissue. Last verified Oct 8, 2026 What Happens When an NC Operator Contract Ends? NC Management Entities must notify the LHD and, as applicable, the manufacturer when an O&M contract is not renewed (15A NCAC 18E .1304(f)). Last verified Oct 8, 2026 What Must an NC Operator Do When Repairs Are Needed? NC Management Entities must notify the LHD within 48 hours when an inspection shows repairs are needed (15A NCAC 18E .1304(d)). Related deadlines covered. Last verified Oct 8, 2026 When Is the NC Operator Inspection Report Due? NC Management Entities must send each inspection report to the owner, LHD, and manufacturer within 30 days of the inspection (15A NCAC 18E .1304(c)). Last verified Oct 8, 2026 When Must an NC Septic Tank Be Pumped? The One-Third Rule NC sets no pumping interval: 15A NCAC 18E .1303(a)(3) requires pumping when scum and sludge exceed one-third of the liquid depth in any compartment. Last verified Oct 14, 2026 Who Needs NC Subsurface Operator Certification? NC Management Entities must be or employ a certified subsurface operator (15A NCAC 18E .1304(a)). School, $101 exam, $53 renewal, 6 CE hours. Last verified Oct 8, 2026

Each state's rules are statewide. How you file them is not — every Texas county takes the report its own way, and in North Carolina every local health department does.