DulyTrack
Reserve

How to submit an aerobic maintenance report in Grayson County, Texas

Grayson County’s permitting authority is Grayson County. Maintenance providers submit the 30 TAC §285.91 report on paper.

County 'Testing and Reporting' form: completed, signed and dated after each maintenance check (every 4 months); one copy to the homeowner and one mailed to 'Grayson County Courthouse – OSSF, 100 W. Houston – Suite G-3, Sherman, TX 75090'. Permit applications use MyPermitNow (MGO Connect).

Reports are due within 14 days after the test (30 TAC §285.7(e)(1)(B)). Verified Oct 5, 2026.

Source: https://www.co.grayson.tx.us/upload/page/0182/docs/Testing_and_Reporting.pdf

Grayson County at a glance

Permitting authority Grayson County
Type County
TCEQ authorized-agent number 620082
How reports are filed paper
Portal —
Channel confirmed? Yes, Oct 5, 2026
OSSF authorizations, 2025 681
Aerobic permits, 2015–2025 6,061
Aerobic share of 2025 permits 96.3%
Licensed maintenance providers 22
Licensed maintenance technicians 25
Rank by aerobic permits 12 of 254

What every Texas report must contain

  • ·The date of the visit and the name and licence number of the provider or technician who made it
  • ·The system owner, the address and the permit number
  • ·Readings taken: chlorine residual, effluent quality, sludge and scum where applicable
  • ·Whether the disinfection device held an adequate supply
  • ·Any maintenance, repair or part replaced during the visit
  • ·What the owner was told to do, and the provider’s signature

From 30 TAC §285.91(4), Table IV. The full list is on what a Texas maintenance report must contain.

The two clocks

A conventional aerobic system with surface application is tested every four months, and each report is filed within 14 days of the test — to Grayson County and to the owner. Miss the second clock and the visit still happened, but the record says it did not.

Permits in Grayson County, 2015–2025

YEAR ALL OSSF SURFACE (SPRAY) DRIP
2015 320 203 12
2016 465 329 15
2017 533 393 14
2018 556 403 28
2019 583 462 31
2020 676 520 39
2021 785 620 49
2022 873 712 87
2023 801 645 100
2024 774 632 111
2025 681 553 103

Authorizations to Construct reported by every authorized agent covering Grayson County. Surface irrigation and drip both require aerobic pretreatment; together they are the 6,061 aerobic systems above. The statewide dataset has all 254 counties.

Is this out of date?

If you file in Grayson County and this is wrong — or if it is right and we have it marked unconfirmed — tell us and we will correct it. This is the only way the 248 unconfirmed counties get confirmed.

Summarizes public records as of Oct 5, 2026: the TCEQ authorized-agent register, the OSSF licence register, and the county’s own published pages. Not legal advice — verify with your permitting authority.