DulyTrack
Reserve

How to submit an aerobic maintenance report in Fannin County, Texas

Fannin County’s permitting authority is Fannin County ((903) 583-7495, lleatherwood@fanninco.net). The county has not published how maintenance providers submit the §285.91 report; most Texas authorities accept email or a document upload, and some run a portal.

Reports are due within 14 days after the test (30 TAC §285.7(e)(1)(B)).

We are confirming the channel — if you file here, tell us how, using the form below.

Fannin County at a glance

Permitting authority Fannin County
Type County
TCEQ authorized-agent number 620074
How reports are filed Not published
Portal —
Channel confirmed? Not yet — help us confirm it
OSSF authorizations, 2025 269
Aerobic permits, 2015–2025 2,734
Aerobic share of 2025 permits 95.9%
Licensed maintenance providers 8
Licensed maintenance technicians 29
Rank by aerobic permits 34 of 254

What every Texas report must contain

  • ·The date of the visit and the name and licence number of the provider or technician who made it
  • ·The system owner, the address and the permit number
  • ·Readings taken: chlorine residual, effluent quality, sludge and scum where applicable
  • ·Whether the disinfection device held an adequate supply
  • ·Any maintenance, repair or part replaced during the visit
  • ·What the owner was told to do, and the provider’s signature

From 30 TAC §285.91(4), Table IV. The full list is on what a Texas maintenance report must contain.

The two clocks

A conventional aerobic system with surface application is tested every four months, and each report is filed within 14 days of the test — to Fannin County and to the owner. Miss the second clock and the visit still happened, but the record says it did not.

Permits in Fannin County, 2015–2025

YEAR ALL OSSF SURFACE (SPRAY) DRIP
2015 185 127 0
2016 252 203 0
2017 292 256 0
2018 263 217 0
2019 271 249 2
2020 268 246 1
2021 305 277 5
2022 389 340 0
2023 335 310 3
2024 247 239 1
2025 269 255 3

Authorizations to Construct reported by every authorized agent covering Fannin County. Surface irrigation and drip both require aerobic pretreatment; together they are the 2,734 aerobic systems above. The statewide dataset has all 254 counties.

Is this out of date?

If you file in Fannin County and this is wrong — or if it is right and we have it marked unconfirmed — tell us and we will correct it. This is the only way the 248 unconfirmed counties get confirmed.

Summarizes public records as of Oct 5, 2026: the TCEQ authorized-agent register, the OSSF licence register, and the county’s own published pages. Not legal advice — verify with your permitting authority.