How to submit an aerobic maintenance report in Collin County, Texas

Collin County’s permitting authority is Collin County. Maintenance providers submit the 30 TAC §285.91 report through the county’s online report form.

County page: 'New OSSF Contracts, Maintenance Reports, and Change of Ownership forms will be submitted through our OSSF Report Portal' (a county web form at apps.collincountytx.gov/Forms/DS-AerobicPermit-Prod). Permit applications go through the Collin County Citizen Self-Service portal (Tyler EnerGov).

Reports are due within 14 days after the test (30 TAC §285.7(e)(1)(B)). Verified Oct 5, 2026.

Source: https://apps.collincountytx.gov/Forms/DS-AerobicPermit-Prod

Collin County at a glance

Permitting authority Collin County
Type County
TCEQ authorized-agent number 620046
How reports are filed web-form
Portal Collin County OSSF Report Portal
Channel confirmed? Yes, Oct 5, 2026
OSSF authorizations, 2025 752
Aerobic permits, 2015–2025 8,433
Aerobic share of 2025 permits 85.1%
Licensed maintenance providers 20
Licensed maintenance technicians 12
Rank by aerobic permits 4 of 254

What every Texas report must contain

  • ·The date of the visit and the name and licence number of the provider or technician who made it
  • ·The system owner, the address and the permit number
  • ·Readings taken: chlorine residual, effluent quality, sludge and scum where applicable
  • ·Whether the disinfection device held an adequate supply
  • ·Any maintenance, repair or part replaced during the visit
  • ·What the owner was told to do, and the provider’s signature

From 30 TAC §285.91(4), Table IV. The full list is on what a Texas maintenance report must contain.

The two clocks

A conventional aerobic system with surface application is tested every four months, and each report is filed within 14 days of the test — to Collin County and to the owner. Miss the second clock and the visit still happened, but the record says it did not.

Permits in Collin County, 2015–2025

YEAR ALL OSSF SURFACE (SPRAY) DRIP
2015 753 631 13
2016 839 723 17
2017 835 721 26
2018 958 830 50
2019 840 735 51
2020 1,087 964 71
2021 872 759 69
2022 841 682 104
2023 717 583 93
2024 769 575 96
2025 752 515 125

Authorizations to Construct reported by every authorized agent covering Collin County. Surface irrigation and drip both require aerobic pretreatment; together they are the 8,433 aerobic systems above. The statewide dataset has all 254 counties.

Is this out of date?

If you file in Collin County and this is wrong — or if it is right and we have it marked unconfirmed — tell us and we will correct it. This is the only way the 248 unconfirmed counties get confirmed.

Summarizes public records as of Oct 5, 2026: the TCEQ authorized-agent register, the OSSF licence register, and the county’s own published pages. Not legal advice — verify with your permitting authority.